For hoteliers

For hoteliers

How our design project makes the hotel profitable

  • Increases room rate
  • Improves the quality of the guest life
  • Improves the service quality
  • Justifies the guest expectations
  • Lowers operating costs
  • Reduces repair costs
  • Reduces the possibility of mistakes and rework costs
Download presentation
How our design project makes the hotel profitable

5 STEPS FOR IMPLEMENTING THE DESIGN OF THE HOTEL PROJECT

1

Design Concept Creating

  • Studying the concept of an object
  • Creating a guest portrait
  • Competitor analysis
  • Creating Effective Layouts
  • Decision on price and level of finish
  • Project budget
2

Engineering systems design

  • HVAC project
  • Water and sewerage project
  • Power project
  • Heating project
  • Security systems project
3

Release an album of documentation

  • Construction draft plans
  • Finishing plans
  • Drawings of furniture, decor items, exploded view of walls
4

Сomplete equipment

  • Selection of all finishing materials, plumbing, doors, tiles, etc.
  • Preparation of specifications and documentation for tenders
  • Comunication and control of suppliers and delivery timeframes
  • Selection and specifications preparation for furniture and decor
  • Selection and specifications preparation for lighting
5

Author's supervision

  • Supervision
  • Project implementation control
  • Contractor management
  • General project management
Download
commercial offer

5 STEPS FOR IMPLEMENTING THE DESIGN OF THE HOTEL PROJECT

  • Design Concept Creating
    1
  • Engineering systems design
    2
  • Release an album of documentation
    3
  • Сomplete equipment
    4
  • Author's supervision
    5
Download
commercial offer
Design Concept Creating
  • Studying the concept of an object
  • Creating a guest portrait
  • Competitor analysis
  • Creating Effective Layouts
  • Decision on price and level of finish
  • Project budget
Engineering systems design
  • HVAC project
  • Water and sewerage project
  • Power project
  • Heating project
  • Security systems project
Release an album of documentation
  • Construction draft plans
  • Finishing plans
  • Drawings of furniture, decor items, exploded view of walls
Сomplete equipment
  • Selection of all finishing materials, plumbing, doors, tiles, etc.
  • Preparation of specifications and documentation for tenders
  • Comunication and control of suppliers and delivery timeframes
  • Selection and specifications preparation for furniture and decor
  • Selection and specifications preparation for lighting
Author's supervision
  • Supervision
  • Project implementation control
  • Contractor management
  • General project management

Only an experienced team can handle this

our team

Team lead

Team lead

Controls the stages of the project and manage the contractor's work.

Designer

Designer

has a vision and experience working with various interiors, understands the goals and objectives of the customer, knows how to combine the beauty and functionality of space.

Architect

Architect

Must be able to develop working documentation taking into account the engineering systems of the facility.

CG artist

CG artist

Visualizes your future interior.

Engineer

Engineer

Develops HVAC, heating, water supply, and sewerage, power and low current systems.

Purchasing manager

Purchasing manager

Selects all finishing materials on time and according to the project budget

We analyzed hundreds of guest reviews and highlighted 5 MOST IMPORTANT FACTORS determining the comfort of guests and affecting hotels rating

General investment structure

HOW DOES THE PROJECT DESIGN RELATE WITH THE TOTAL BUDGET FOR THE HOTEL

HOW DOES THE PROJECT DESIGN RELATE WITH THE TOTAL BUDGET FOR THE HOTEL